{"id":109,"date":"2007-01-11T21:51:15","date_gmt":"2007-01-11T21:51:15","guid":{"rendered":"http:\/\/blog.choochoolarouge.com\/?p=109"},"modified":"2013-12-03T19:52:45","modified_gmt":"2013-12-03T19:52:45","slug":"nearly-rolling","status":"publish","type":"post","link":"https:\/\/blog.choochoolarouge.com\/?p=109","title":{"rendered":"Nearly Rolling"},"content":{"rendered":"<p>Andy has been slaving night and day all week getting the studio ready for Saturday.\u00a0 I&#8217;ve only been working nights, and Vinnie got to see the studio in person for the first time Monday, and showed off his drywalling skills.\u00a0 We&#8217;re 95% ready to roll tape!\u00a0 We started framing the wall and door to seal us off from the rest of the basement.\u00a0 After the weekend we&#8217;ll build an inner wall and door for better isolation.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" alt=\"\" src=\"http:\/\/www.choochoolarouge.com\/blogimg\/starting.jpg\" width=\"640\" height=\"529\" \/><\/p>\n<p>The second part of the wall without the door is finished, two layers thick with insulation between, just some final cracks to seal.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" alt=\"\" src=\"http:\/\/www.choochoolarouge.com\/blogimg\/building.jpg\" width=\"640\" height=\"529\" \/><\/p>\n<p>After some clean up and setting up shelves we got the equipment set up, and I checked the wiring and tested the tape deck.The corner is filled with bagged insulation for sound control. We&#8217;ll make it look better later, we promise.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone\" alt=\"\" src=\"http:\/\/www.choochoolarouge.com\/blogimg\/mix.jpg\" width=\"640\" height=\"529\" \/><\/p>\n<p>We threw most of Andy&#8217;s equipment on shelves and brought in a small army of amps, so we&#8217;re just about ready for Saturday. After that recording we&#8217;ll continue improving the studio and post updates whenever something looks good.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Andy has been slaving night and day all week getting the studio ready for Saturday.\u00a0 I&#8217;ve only been working nights, and Vinnie got to see the studio in person for the first time Monday, and showed off his drywalling skills.\u00a0 We&#8217;re 95% ready to roll tape!\u00a0 We started framing the wall and door to seal [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[],"class_list":["post-109","post","type-post","status-publish","format-standard","hentry","category-studio"],"_links":{"self":[{"href":"https:\/\/blog.choochoolarouge.com\/index.php?rest_route=\/wp\/v2\/posts\/109","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.choochoolarouge.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.choochoolarouge.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.choochoolarouge.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.choochoolarouge.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=109"}],"version-history":[{"count":1,"href":"https:\/\/blog.choochoolarouge.com\/index.php?rest_route=\/wp\/v2\/posts\/109\/revisions"}],"predecessor-version":[{"id":110,"href":"https:\/\/blog.choochoolarouge.com\/index.php?rest_route=\/wp\/v2\/posts\/109\/revisions\/110"}],"wp:attachment":[{"href":"https:\/\/blog.choochoolarouge.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=109"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.choochoolarouge.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=109"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.choochoolarouge.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=109"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}